orchestrata_governance.factory.formalization
Reference › components › governance › orchestrata_governance › factory › formalization
Formalization of requirements in the factory (SPEC-033 C4). Requirements become a formalization of variable, domain and constraint objects. c4 (200 lines) analyses it and returns a c4_report with contradiction_finding and under_constraint_finding entries; formalization_too_large reports an oversize input. dor_bridge (B26, REQ-033-C4) feeds the findings into the definition-of-ready procedure.
12 modules, 740 lines of code.
Modules
| Module | Summary | LOC | Lifted from |
|---|---|---|---|
c4 |
Residue-only lift of frozen factory.formalization.c4 (ADR-0103 P2-F). |
200 | lifted from orchestrata_ultimate.factory.formalization.c4 |
c4_report |
28 | ||
constraint |
69 | ||
constraint_kind |
15 | ||
contradiction_finding |
23 | ||
domain |
20 | ||
dor_bridge |
DoR integration bridge for SPEC-033 C4 findings (B26, REQ-033-C4). | 48 | lifted from orchestrata_ultimate.factory.formalization.dor_bridge |
formalization |
127 | ||
formalization_too_large |
12 | ||
models |
Residue-only lift of frozen factory.formalization.models (ADR-0103 P2-F). |
143 | lifted from orchestrata_ultimate.factory.formalization.models |
under_constraint_finding |
23 | ||
variable |
32 |