Tools-family implementation plan (N-V3 / N-V4) — specs, design, implementation

Status: Awaiting ratification · Date: 2026-10-18 · Authorised by: Mohamed 2026-10-18 ("create a detailed plan including specs and design and implementation of the missing features first, then implement them all until they are done, then go forward with the rest of the plan") · Follows ADR-0106 (Accepted: "Hold the claims, gate green now") — this plan ends the holds by implementing the held features.

1. Scope

Implement the five features the lift deliberately stopped (the N-V3/N-V4 tools knot), so every package parity suite is green with zero held claims, then finish the ADR-0105 push packet.

# Feature (frozen) LOC Blocker (why it was stopped)
1 agents.tool_registry — ToolExecutor, _ApprovalOverrideTool (+ _DDGResultParser, _HTMLTextExtractor already landed) 2,164 imports 25 names from orchestrata_ultimate.tools.*
2 agents.volks.architect.volk — ArchitectVolk 638 function-scope import orchestrata_ultimate (repo-root hack)
3 agents.volks.codedirector.volk — CodeDirectorVolk, CodeDirectorAgent 631 same repo-root hack
4 agents.volks.codedirector.implementation (rest of module) 591 repo-root hack + scripts.serialize_codebase_ast (2 functions)
5 verification.spec_completeness 308 orchestrata_ultimate.openspec.requirements_parser

Measured blockers, frozen snapshot e57782ea4:

2. Specs

3. Design (the N-V3 / N-V4 rulings — Proposed ADR-0107 / ADR-0108)

4. Implementation phases (each ends green + committed)

5. Risks

6. Verification gates

Each phase: package venv suite 0 failed · pre-commit review PASS · RTM before/after · run_tests.py --affected origin/master...HEAD at P6 with 0 UNTESTED · ship.sh green · pushed.