Feature plan — SPEC-

Instantiate this template for EVERY spec feature before implementation starts (user ruling, 2026-07-06). A feature is NOT done when its modules exist and their unit tests pass — it is done when the code is CONSTRUCTED at a composition root, REACHABLE from an entrypoint, TRACED, and the RTM displays exactly that. Phases 4–6 exist because 96 modules (~26K LOC) were once built, tested, and never wired.

1. Requirements

2. Design

3. Implementation units

Module Classes/functions @traces reqs Tests
src/… … REQ-… tests/…

4. WIRING PLAN (mandatory — the phase that was historically skipped)

5. Wiring proof (tests that fail if the wiring is removed)

6. Traceability gate

7. Quality gates

8. Definition of done