Orchestrata Ultimate › Plans › spec-audit › reverify-2026-10-18 › I-tools

Cluster I — Tools suite re-verification (061–072)

Source: plans/spec-audit/reverify-2026-10-18/I-tools.md at 8a2cb42ad · last changed 2026-10-18 · first committed 2026-10-18 · 327 lines.

Prose pending.

Plan text

Cluster I — Tools suite re-verification (061–072)

Read-only re-audit against CURRENT code on branch components (HEAD de9e996f2), 337 commits past the session-195 audit. Method: AST toolkit only for Python source; checklists/requirements.md boxes ignored (stale); every claim has file:line from serialize_codebase_ast.py or the AST-derived docs/CODEBASE_MAP_FULL.md skeleton.

Headline finding

Session 195 classed 063–072 as all GAP (greenfield). That verdict is now obsolete. The "tool wave" landed the entire tool suite. The unified framework (K2 — BaseTool, ToolMetadata, ToolRegistry) is built and wired, and 11 of the 15 tools SPEC-062 enumerates are implemented and registered through one central site agents/tool_registry.py:2061 register_native_tools. Two specs are ARCHIVED by ruling (066 PowerShell, 070 Team — session 227, plans/tool-wave-plan.md), and three tools remain PARTIAL (065 LSP, 068 ScheduleCron, 071 MCP). 061 (CheetahClaws Volk) is PARTIAL (a real, gateway-wired integration exists but lacks checkpoint/rollback).


SPEC-061 cheetahclaws-volk — PARTIAL

SPEC-062 cheetahclaws-tools-gap — DONE (framework) / roadmap residual under 066/070/071

SPEC-063 repl-tool — DONE

SPEC-064 git-worktree-tools — DONE

SPEC-065 lsp-tool — PARTIAL

SPEC-066 powershell-tool — ARCHIVED (GAP, out of scope)

SPEC-067 remote-trigger-tool — DONE

SPEC-068 schedule-cron-tool — PARTIAL

SPEC-069 task-management-tools — DONE

SPEC-070 team-tools — ARCHIVED (GAP, out of scope)

SPEC-071 mcp-resource-tools — PARTIAL

SPEC-072 tool-search-tool — DONE (capstone no longer blocked)


Cluster summary table

Spec Class Effort Hard deps
061 CheetahClaws Volk PARTIAL M checkpoint/rollback subsystem; none external
062 tools-gap (framework) DONE — residual McpAuth → 071; PowerShell/Team archived
063 REPLTool DONE — — (REST/WS/CLI optional)
064 Worktree Tools DONE S (optional ListWorktreesTool) —
065 LSPTool PARTIAL M–L multi-language LSP + completion/code-actions/rename/format; rescope decision
066 PowerShellTool ARCHIVED (GAP) — Windows host (never)
067 RemoteTriggerTool DONE — 062↔067 SSH-vs-HTTP note only
068 ScheduleCronTool PARTIAL M background scheduler loop; missed-job recovery; SQLite-vs-Redis decision
069 Task Tools DONE — (Redis/WS optional)
070 Team Tools ARCHIVED (GAP) — auth/JWT + multi-tenant (never)
071 MCP Resource Tools PARTIAL M McpAuthTool; TTL cache; server registry; vault; governance
072 ToolSearchTool DONE — —

Evidence log (commands run + results)

(End of file)